|
BASIS Oro Valley Oro Valley, Arizona
- 32,000 s.f. facility.
- 5-12 school grades.
- Built in 5 months from concept sketch to Certificate of Occupancy.
- Krebs Carhuff Architects and Canyon Building and Design worked together as a design-build team.
- Utilized pre-engineered steel structure and masonry for efficiency in construction.
|